Scope of Work
The work will consist of earthwork, constructing four (4) 10-foot x 6-foot concrete box culverts, head walls, retaining walls, concrete sloped paving, concrete sidewalks, curb/gutter and asphalt paving and 8-inch reclaimed water line, placement of paving striping, installing traffic signage, chain link fencing and electrical conduit and traffic control.
Project Manager: Edward Balderrama
Primary Contractor: La Calerita Construction
Estimated Project Cost: $1,048,136.67