Scope of Work

The work will consist of earthwork, constructing four (4) 10-foot x 6-foot concrete box culverts, head walls, retaining walls, concrete sloped paving, concrete sidewalks, curb/gutter and asphalt paving and 8-inch reclaimed water line, placement of paving striping, installing traffic signage, chain link fencing and electrical conduit and traffic control. 

Project Manager:  Edward Balderrama
Primary Contractor:  La Calerita Construction

Estimated Project Cost:  $1,048,136.67